北京西北热电中心京能燃气热电工程
创建日期2017-09-25浏览日期2023-06-01浏览次数3794
本项目位于北京市石景山区广宁路10号,建设规模为3×400MW级(F级)燃气供热机组.本工程于2012年09月开工,2014年8月“二拖一”机组整套启动168小时试运完成,2014年10月“一拖一”机组整套启动168小时试运完成,获“2016年度亚洲创新电力技术金奖”,荣获“2016-2017年度中国最佳投资特别奖”。

The project is located in Guangning 10th Road, Shijingshan District,Beijing, consists of 3 × 400MW class (F) gas heating unit (3×300 MW gas turbine+300MW steam turbine+135MW steam turbine), started on September, the first unit put into operation in August 2014, the second unit put into operation in August 2014, was awarded "2016 Asia Innovative Power Technology Gold Award", and "2016-2017 Chinese Best Investment Special Award."